GAOZIT ENTERPRISE WUHAN, CHINA MUNICIPAL & WATERWORKS CASTINGS EXPORTfranklin@gaozit.com
DOC // GZT-CAT-2026 MUNICIPAL & WATERWORKS PIPELINE SYSTEMS 10 VERIFIED SERIES · 64 CONFIGURATIONS · EN 1074-2 BENCH TESTED

DUCTILE & CAST IRON · WUHAN, CHINA

Cast iron &
pipeline supply
for waterworks.

Access covers, ductile iron pipe fittings, water-supply valves and flange adaptors — matched to your project drawing, pressure rating and connection interface, with coordinated inspection and export packing.

01 // SYSTEM ARCHITECTURE

Four core product lines for
waterworks and civil utilities.

Open full filterable catalogue →
01 // COVERS 2 series · 2 configs
Access covers & gratings 01

Access covers

Access solutions for utility networks, roads and underground infrastructure.

Filter access covers →
02 // FITTINGS 3 series · 23 configs
Ductile iron fittings 02
03 // VALVES 3 series · 18 configs
Water valves 03
04 // JOINTS 2 series · 21 configs
Joints & repair accessories 04

02 // INTERACTIVE SPECIFICATION WORKBENCH

All 10 verified series & 64 configurations.

Dismantling joint

Pipeline assembly

Dismantling joint

A flanged assembly for accommodating installation length and allowing equipment removal.

DN50–300PN16Flanged9 configurations
View series →

03 // QUALITY & EN 1074-2 BENCH VERIFICATION

Specification review, bench verification
and pre-shipment control.

Our water-supply gate valves are type-tested in accordance with EN 1074-2. Before production and dispatch, we align nominal dimensions, connection interfaces, inspection scope and shipping documents with your purchase order.

EN 1074-1 / EN 1074-2 REFERENCE BENCHMARKS (PFA 16 · PEA 25) Interactive calculator ↗
Operating & strength torqueMOT / mSTClause 5.2.3 & 5.1.4 by DN & key type
Shell hydrostatic test25 barp = max(PEA, 1.5 × PFA)
High-pressure seat test17.6 barΔp = 1.1 × PFA (water)
01

Drawing & interface verification

Confirm nominal bore (DN), clear opening, flange drilling, load or pressure class and material grades before quotation.

02

Production & inspection alignment

Coordinate configuration details, dimensional checks, coating measurement and applicable pressure or functional tests.

03

Export packing & documentation

Prepare timber crating, pallet protection, item marking, packing-list reconciliation and shipment documents.

04 // Export packing & dispatch vault

Packing photographs from
recent container dispatches.

Photographs of crates and containers prepared for export. New pictures are added as cargo is packed. They illustrate packing practice; they are not a stock list or a named-customer record.

107 packing photographs · December 2025 — September 2026

Open monthly archive →
ARCHIVE · 107 Open chronological log December 2025 — September 2026

05 // ENGINEERING DATA & TOOLS

Technical datasheets, test notes
and specification checklists.

Browse all resources →

PROJECT & QUOTATION ENQUIRIES

Send your bill of quantities
or technical drawings.

Provide the product series, DN or opening size, pressure or load class, quantity and destination port for a structured specification review and quotation.